Site follow-up report in North Rachuonyo, South Rachuonyo and Rongo district.UDDTs by Wycliffe Osumba.Sumitted on 08-08-2010

Site Areas: South Nyanza Water Services Board
Areas Covered were: North Rachuonyo District, Rongo district and South Rachuonyo

Summary of the sites followed-up finding and Awareness creation on ecosan Toilet
Follow-up on the sites showed that most households and institution UDDTS whose construction were commissioned May 2009 were still under construction. Also,some UDDTS were finished but lacked fitting;The urine pipes, urine containers and water tanks were not installed by the contractors,These included the ones at Rongo district, Rangwe in Homa Bay District and Ndhiwa District for 49 units.

In North Rachuonyo District, the units constructed were in use and some farmers were already using the end product in their farms as well as in their horticulture farms.

Current Status
· There are 16 household units constructed in one of the groups in North Rachuonyo District. In Nyomindi Cluster, 14 UDDTs are in use and some farmers had started using the urine and compost faeces in their farms. Some farmers were using the end product in their bananas, mango trees, onions and kales.
· Rongo has much pending work both at school and in the community which were not completed accordingly. The same applies to Ndhiwa and Homa Bay Districts. They all need more training on the usage of the units.

Date - 27/07/2010

Group - CBOs · Wang’chieng’ Group · Wang’apala· Nyasore
Activity - Meeting CBO representatives awareness creation on ECOSAN
District - Karachuonyo

Comments/Achievements
The meeting was conducted as planned and all the group’s representatives attended. Topics covered were: definition of ECOSAN, Principles of ECOSAN, Usage, importance of ECOSAN. They demanded that the project be extended to them because it had been implemented in other areas but nobody had seen the UDDTs in their district.

Date - 28/07/2010
Group - Office
Activity - Typing training manual book
District - North Rachuonyo

Comments/Achievements
Typing took place as it was planned and the training manual is almost ready to be used.

Date - 29/07/2010
Group - Nyomindi Self Help Group
Activity - End product follow-up and update training
District - North Rachuonyo

Comments/Achievements
The follow-up was conducted to the same group members whose composted fertilizer were ready for use and demonstrated on applying them when planting.

Date - 30/07/2010
Group - Kadoma Self Help Group
Activity - Awareness creation at Kitere Camp meeting
District - Ronngo District

Comments/Achievements
The awareness creation created to over 300 people on ecological sanitation and the importance of the units. Most people that came from different areas requested for these units to be extended to Migori district, Awendo district, Kuria district so that people could see them and construct them in schools, churches, and at household levels. This is because the soil types in there are weak and most pit latrines collapse during rainy season.

Date - 02/08/2010
Group - Kodoma
Activity - Fitting water tanks and taps
District - Rongo

Comments/Achievements
The fitting was done to 8 people whose construction was completed by the contractor and left the water tanks incomplete.

Date - 03/08/2010
Group - Rapedhi SDA Church
Activity -Awareness creation on ECOSAN
District -Ndhiwa

Comments/Achievements
The pastor at Rapedhi SDA church invited me to their camp meeting for awareness creation on ECOSAN toilet. The meeting was conducted and the population reached 260 people. They demanded for the project to cover their region because of the importance and recovering the end products.

Date - 04/08/2010
Group - Office
Activity -Repot writing
District -North Rachuonyo

Comments/Achievements
Writing field report and training manual.

Date - 05/08/2010
Group - Church of God 7th Day an International Community.
Activity -Training on how to use the compost feases after one year storage
District -North Rachuonyo

Comments/Achievements
Training was conducted to the church members both theory and practical and we transplanted the onions using compost feaces at the church garden. The population reached was 20.

Date -06/08/2010
Group - Nyomindi Self Help Group.
Activity -Practical training on the application of the end product.
District - North Rachuonyo

Comments/Achievements
This mother had applying the compost ECOSAN product after leaving it for one year. They had transplanted onions and tomatoes and were waiting to transplant sukuma wiki (Kales).

Dates - 08/08/2010
Group - Office
Activity - Repot writing and sending
District - North Rachuonyo

Comments/Achievements
Reports were composed and sent.


Problems Identified

  • The contractors were not committed in their work using some godfathers at the GTZ office.
  • Using of untrained artisans during the construction
  • The contractors were not trained on ecological sanitation principles.

Pending Works
· Training is needed to both the communities where the units were constructed and the schools.

Read more...

Schools and house hold follow up in Homa bay,Rongo,Ndhiwa and Rachuonyo districts.UDDTs.by Wycliffe Osumba.Submitted on 07-17-2010

Site area
South Nyanza water service board post ecosan construction follow ups for Schools and house holds.
Rongo District
The follow up was conducted on the following schools;

Nyarach primary school
In the above school, the UDDTs constructed were in use, but later on it ceased due to poor usage, blockage of the urine pipe, ash was not available for usage, and the community were not involved during the training . All the UDDTs are in bad state, some doors are broken , urine bins are not in place, no water tank in place and termites had destroyed urine doors.

Wayforward
An agreement was made with the deputy teacher to organize with the community, a one day training session focused on , ownership, sustainability, philosophy of ecosan and maintenance of UDDTs toilet.

Nyarach Primary School UDDT in Rongo District.Not used properly. Urine door rotten due to rainfall.Nyarach primary School.
UDDT chamber in use but without application of ash.
Choked UDDT in a poor state due to wrong user procedures. Nyarach primary school.

Rongo Primary School
The above school had four doors of the UDDTs constructed for them, two doors for boys , one door for girls, and one door for the teachers. they started using them , but they stopped usage due to the following reasons;
  • Lack of proper training of parent, pupils and teachers on the ecosan concept.
  • Parents were not willing to have their children bring ash to school for use.
  • Monitoring to use ecosan toilets became a problem due to large ratio of pupils population to toilets in the school (1400 as against 3 doors).

Current Status

  • Urine pipes are blocked
  • They are poorly used
  • They used the units with out applying ash after usage
  • No hand washing in place
  • Termite invaded urine doors
  • And the units lack of proper care
UDDT chamber at Rongo Primary School. In a bad state due to bad maintenance and no use of ash after patronage.
Blocked UDDT squatting pan due to lack of maintenance. Rongo Primary School.

Broken Chamber door, due to Lack of maintenance at Rongo Primary School.

Holes prepared for tree planting at Rongo Primary School dug by the health club. fertiliser from UDDT to be applied.

Wayforward

Post construction training will be conducted for parents, teachers, and community members, on ownership, sustainability, the concept of ecosan toilets , as well as their roles and responsibility.

Ndhiwa District

The construction at ratanga mixed secondary school was completed and students were allowed to start using them by July, 2010 . The follow up will be conducted when school will be opened in September 2010.

Rachuonyo District-The follow ups were conducted for both school and the community.

Kendu muslim mixed secondary school

All the UDDTs are in use, the boys side is in good condition. however, that of the teachers and girls are in bad state. For the teachers, the urine containers are not well maintained, for the girls, they donot use ash anytime they visit the unit.
The health club was formed and they play a good role on the side of the boys.
The school garden has been made, they have planted maize as a top dressing.
The UDDT technology has been accepted because of the practical benefits realised. Almost All the pit latrines collapse during the raining season.

Wayforward

They need update training, which will be conducted when school reopens in September 2010.
Demonstration farms are in place and in the next term they will start using urine for top dressing their crops.

Sunken pit latrine site. This came about due to the poor soil quality.

A well maintained urine chamber at Kendu Muslim Sec.School.

Households - North kamenya self help project group

They had 16 constructed UDDTs and all are working , they started using the units in 2009 and one chamber is almost full , they used urine during the planting season for top dressing and the result was good compared to the harvesting done in 2008.

Application for urine was applied to the following:

  • Mango trees planted,tree nursery, bananas, and cereals
  • Rationing of urine are 1 to 3 for trees and for cereals are 1 to 5
  • House hold with 10 urine of 20 litres takes one week to filled up
Problems
  • Hand washing tanks has not been installed due to insecurity
  • Urine pipes are normally blocked and to rod it is not easy
  • Termites have infested some of the urine doors
  • Backdoors wooden frame has been beaten by rain and is causing it to rot.
Solutions
  • Urine pipes need to be replaced by wash pipes for easy management.
  • Hand washing needs to be replaced by Ferro cement water tank, for it to be permanent
  • Background needs to be made to metallic frame and plate of 18 gauge.

Activities of sustainability groups

  1. Started four tree nurseries
  2. Micro saving and credit

Tree planting such as

  1. Mango planting 2010 200
  2. Orange planted 2010 300
  3. Pawpaw planted 2010 300
  4. Banana planted 2010 250

Community demand of UDDTs

During the rainy season,which was from the start of April-July 2010, most pit latrines collapsed while the Ecosan UDDTs were the only toilets that remained.
Due to the uniqueness of Ecosan toilets, communities are now demanding more. They are ready with the locally available materials such as sand, ballast, round poles, hard covers, water unskilled labour, marram.

Community meeting

We had two different group meetings for which I was invited to facilitate them on Ecosan.The attendance was good.
Seka Kamser sub/location population 86 people
Obama health and community development programme population reached was 200 people, that were demanding technology

Topics covered
  1. Philosophy of Ecosan
  2. Types of ecosan toilets
  3. Benefits, usage, maintenance, bill of quantity

Homa bay district

The following was carried out to Ndiru primary school and all the units constructed are in use. They started using them in May 2010.

The health clubs are maintaining them well and they had started planting trees in school. They are going to start working in school gardens when the school will be open.
The community members were already being trained on the UDDTs and they welcomed the technology and demanding more Ecosan to be constructed in their home so that pupil learn to be constructed in their home s that pupil learn on how to use them both in school and home.

Planned activities for two weeks
Schools follow ups Radienya primary school
Development of training manual –office
Typing the written manual –Oyugis
Community meeting –Oriang’ Maumi Nyochoo Women group
Training Athi water service board identified artisan for 5 days both theory and practical on Ecosan toilet UDDTS Thika

Please see link for more photos on ecosan flikr collection:

http://www.flickr.com/photos/gtzecosan/sets/72157624822485131/

Read more...

Community follow-up and training on UDDTs construction in Rachuonyo North and Radienya Nyakach districts,by Wycliffe Osumba.Submitted on 28-07-2010

Achievements
Two trainings were conducted as per the planned activities on post construction of UDDTs to the following:


Radienya Nyakach District

I met parents, teachers and school committee on eco-san post construction.
The topic covered:
· Philosophy of eco-san
· Why eco-san
· Types of toilets
· Destruction of the pathogens
· Application of the end products
· Roles and responsibilities
· Sustainability of the project

General comment: The community was happy with the new technology introduced to the school. They demanded that the units be extended to the communities around.

Observation
· Health clubs activity involved maintaining the units in a good status.
· They had school gardens, and cultivated cowpeas.
· Radienya has become a place where people go and see how the UDDTs are being used.
· The population at the time the training was conducted is 80 people.

Problems
· The school used to have problems of collapsing pit latrine and even in the year 2010, their pits collapsed, but eco-san remained.
· The population of pupils exceeds the capacity of the constructed units.

Way Forward
· We agreed that they will sustain those constructed units and do any repair required.
· Their pupils will come with the ash needed for the unit.

Rachuonyo North District
I visited one of the church members who had constructed UDDTs on their own.
A training session was conducted for the church elders from different churches on eco-san technology.

Topics Covered included;
· Philosophy of the eco-san
· Importance of UDDTs
· Why eco-san
· Destruction of the pathogens
· Usage of the end products

The church has already made a vegetable garden. To promote church development, they will sell the vegetables to generate income. Some of these vegetables include onions, tomatoes and sukuma wiki in the nursery waiting for planting.

They had prepared the garden and they are waiting to start using urine as their first harvesting,whilst they still wait for faeces to be ready.






Nursery for tomatoes and Sukuma Wiki (kales) yet to be planted using the end product from Ecosan.


Nursery for onions yet to be planted using the end product from Ecosan.



The church elders and pastors at the nursery place.




Training the church elders and pastors on the ecological sanitation usage and maintenance of the end product in their church compound at Nyanchwa Church of God Seventh Day an International Community.

Training Tana water service board
The training was conducted for 6 days, starting from Monday to Saturday.

Day one, we went through the theory on eco-san. Topics covered were:
· Philosophy of eco-san
· Types of toilets
· Materials required (costing)
· Destruction of the pathogens
· Maintenance of the units
· Application of urine and rationing
· Composting procedure
· Usage of the end products in the field
· Construction Procedures
· Roles and responsibilities for the sustainability projects

Training was conducted for the artisans from different CBOs (Community based Organisations), in the preparation of constructing UDDTs in their respected CBOs. Total noumber of trainees were; three(3) from the Tana Water Service Board and Twelve(12) artisans.

The supervision and monitoring was conducted by the water service trust fund from Nairobi.

The construction of the three doors was constructed for both chambers and two courses of the superstructures.

Observation:Trainees were happy with the technology they had learnt about during the 6 day training period.

Way Forward

Each artisan was to go into their CBOs to start the UDDTs construction · Monitoring will be done by the trainees where we had conducted practical training. Planned Activities · Follow-up of the household person · Report writing · Finalizing the training manual.
Training the artisans on the theory of ecosan toilets.

Trainees laying the first courses of UDDT chambers.

Trainees inserting the eco plates and weld mesh before casting floor slab.


The trainees with their trainers after finishing setting the superstructure Closing remarks by Eng. Macharia from Water Trust Fund.

Please see link for more photos on ecosan flikr collection:

http://www.flickr.com/photos/gtzecosan/sets/72157624960488440/