Meru Prison Biogas sanitation - DEWATS

Report by Moses Wakala
Visited: on the 16 -17th September
Contact: Mr. Charles Mutembei (Officer in Charge) and Meru Water Company Mr. Moses Njiri (mnjiri@yahoo.com)


LOCATION AND CONDITION
Meru GK Prison is a government institution located in eastern province in Meru County and about 220 KM on Nairobi Isiolo road. It has over 1200 inmates and over 300 staff in the 15 hectare compound. The prison is on a sloping ground and is supplied with water from the Meru Water company. The prison management realized the potential of the ecological sanitation through a sensitization from the EPP staff. The prison has a big problem of high firewood consumption for cooking the prisoners’ meals. The prison had also high sewage treatment bills from the treatment plant. These issues combined made the prison management to look into possibilities of adopting new technology from ecosan. Initially all the waste generated from the prison was treated by the municipal sewer. The new technology aimed at treating all the waste in the digester and baffle reactor and reusing the treated effluent in the prison farm as irrigation water and fertilizer. The product of anaerobic decomposition, biogas, also called methane was to be used in the kitchen as source of energy.

View of Anaerobic Baffled Reactor
Currently as on the date of visit, the digester is being fed by four toilets and the cowshed with two zero-grazed animals. There was no gas production as a result of leakage at the neck seal. This was an opportunity to train the prison officers on the sealing and daily maintenance of the treatment plant. All the treatment components from checking seemed to be working well.
Initially, all the waste from the male prison cells and kitchen was connected to the digester. The digester developed a structural failure and also an over-flow within fewer days than specified in design was noticed. These two reasons led to closure of the entire system and deviation of the main prison waste back to municipal sewer. It has been left like this for almost a half a year. On the visitation day, it was noticed that the service pipes laid earlier connecting the staff toilets and the digester had clogged with surface run-off mad. This must be opened during the re-connection.
It was also realized that one of the water-traps manholes near the kitchen was coved with soil completely and could not be established if it was in a working condition. This is an urgent maintenance duty to be done by the prison officers as the gas was to be used in the kitchen soon after sealing the neck.

Training of Meru Prison Personnell on sealing the top manhole of the biogas
digester - 4 pour flush toilets of officer housing that are connected to the
plant are seen in the background
 CHALLENGES
The main challenge in the project is the excess water flowing non-stop from the cells toilets and kitchen. This water seems to be more than the design parameters and it pushes all the waste out of the treatment plant before the end of the design retention time. With this happening, the quality of the effluent is bad and thus causing pollution to the underground water.

RECOMMENDATION
I highly recommend a design to reduce the amount of water from the waste before it is discharged to the digester. This could mean that the shower water and any excess kitchen water can be separated before it flows out for treatment. The grey water and kitchen water could be treated in the aeration ponds in the prison while the rest to undergo anaerobic treatment.
The second water trap near the VIP toilet should be checked and all the soil removed on the cover. It could be important to raise the manhole walls to ensure its accessibility.
The blocked service pipes from staff line should be checked and all mad removed before connection to the digester again.
Meanwhile before other connections, it is better for the system to be tested as it is with 8 staff toilets connected and the cowshed. This will help the prison to establish the output and efficiency of the digester after the previous repairs.


Picture of cow stable with feeding chamber, where cow manure
added to the biogas digester
 

Read more...

Maps of ecosan projects in Kenya

posted by Christian Rieck (GIZ)

The GTZ sustainable sanitation program has been active in utilising the available data from the EU-Sida-GTZ Ecosan Promotion Project for purposes of follow up activities, monitoring, evaluation and knowledge sharing. One result are maps based on the GPS (Global Positioning System) Data collected from each household toilet, school and public toilet project. Soon we will be able to make the maps available to you.

The following screenshots show an example of the information contained in the maps. On the right you have the legend showing the different pins (mark ups) used to show each project. You see the following categories - UDDT household, UDDT public, UDDT school, DEWATS public and DEWATS school.

Overall view of projects

Western and Nyanza Province (with most of ecosan units)
 
Chwele cluster

Butere Mumias cluster


Siaya-Yala-Ugunja cluster
Ramba-Lwak-Bondo cluster

Kisumu cluster

Nyabondo cluster

Kendu Bay cluster

Rangwe-Rongo cluster

Zoomed in view:
Household UDDT toilets around the town of
Malanga (Siaya district) with road map display
School UDDT toilets around the town of Malanga (Siaya district) with satellite display

Read more...

Sanitation as a business

New Sustainable Sanitation Practice is OUT NOW!

The topic is „Sanitation as a business” with different examples how values can be created and how entrepreneurs can be interested to provide services in sanitation systems. 

You can also find one local example for Kenya: Community-based, resources-oriented management of separated human waste in peri-urban areas in Nakuru, Kenya and the outcome of a workshop organized by WASTE in Nairobi with the objective to explore Business Opportunities in Sanitation.


Read more...