List of activities during contract period of August-November 2010
Date | Activity | Place | Comment / achievements. |
6.8 | Training | - Nyomindi self help group | Training was conducted on practical on how to apply the end products from the composed Ecosan product, before transplanting Onion, Tomatoes and Kales, population reached 20 people. |
8.8 | Report writing | - Office | Report was complied |
9.8 | Ecosan toilet follow-up | - Bwoya community self help group | Follow-up visits was conducted tot this groups, the units were in use , but maintenance and usage of the units was very poor. |
9.8 | Awareness creation on Ecosan toilet | - Kokise Primary School, Omiya Village | The village demand Ecosan toilet, after experiencing collapsing of pit latrine, which has made many people to use bush system, or open defecation along the lake side, population reached 84 people |
10.8 | Ecosan toilet follow-up visits | - Kamin Ogedo Priamry School | The four door units were still under construction, keying painting, water tanks, urine doors, urine pipe, urine container and gutter was not fitted. They are not in use. |
11.8 | Ecosan toilet follow-up visit | - Nyamaseria community | All the constructed units are in use only one are being used when the owner came back home from Nairobi. Grafted Mango Trees are being planted. |
12.8 | Report writing | - Office | Report was complied |
12.8 | Community meeting | - Kendu – Bay | Meeting was conducted to the group representatives, from Dirom, Upendo, and Kase Groups, on the update training as TOT’s. trainers of trainees. Population reached 9 people. |
13.8 | Awareness creation on ecological sanitation and HIV/AIDS | - Nayburi S.D.A Church group meeting | Awareness was created to the church member who ware demanding the project on Ecosan toilet and HIV/AIDS management of people living with HIV/AIDS and group support ( holistic care) population reached over 400 people. |
16.8 | Update training on Ecosan toilet | - Homa Hill’s Centre | Training was conducted to the following groups 1. Kamwania Youth Group – 12 people 2. Kodero Women Group- 20 people 3. Norway Support Groups for living with HIV/AIDS Topic: covered why Ecosan, application of end product, gas of Ecosan. Pre and post test counseling, supportive counseling, adherence counseling and group formation process demand for Ecosan project . population reached 50 |
17.8 | Practical training on the application of end product | - Dirom self help group | Practical training was conducted on how to apply urine for top dressing and how to apply the composted feaces products after staying in the chamber for 9 months. Population reached 27 people . |
18.8 | Ecosna toilet follow-ups visits | - Upendo Women Group | All the constructed 13 units are in use and they have no problems with the maintenance, no smelling, flies and resist rainfall . all pit latrine in that area collapsed due to rainfall, other community members are demanding the project. Population reached 30 people. |
18.8 | Community meeting | Nyochoo, Kanonje,Tanglweting,student from Japan. | The meeting was conducted with collaborator OSIENAL,student from Japan and community groups. Where G.T.Z Ecosan promotion project was implemented. Purpose was to conduct survey, for non- users of Ecosan and users of Ecosan. Population reached 33 people. |
18.8 | Community meeting | Nyochoo, Kanonje,Tanglweting,student from Japan. | The meeting was conducted with collaborator OSIENAL,student from Japan and community groups. Where G.T.Z Ecosan promotion project was implemented. Purpose was to conduct survey, for non- users of Ecosan and users of Ecosan. Population reached 33 people. |
31.8 | Data collection on Ecosan toilet | Nyochoo | Second day population reached |
31.8 | Data collection on Ecosan toilet | Tanglweti | Non user-17 people |
31.8 | Data collection on Ecosan toilet | Kanyonje | Users-15 people |
31.8 | Data collection on Ecosan toilet | Nyochoo | Second day population reached |
31.8 | Data collection on Ecosan toilet | Tanglweti | Non user-17 people |
31.8 | Data collection on Ecosan toilet | Kanyonje | Users-15 people |
1.9 | Data collection on Ecosan toilet | Nyochoo | Third day population reached. |
1.9 | Data collection on Ecosan toilet | Tanglweti | Non users—23people |
1.9 | Data collection on Ecosan toilet | Kanyonje | Users—18people |
1.9 | Data collection on Ecosan toilet | Nyochoo | Third day population reached. |
1.9 | Data collection on Ecosan toilet | Tanglweti | Non users—23people |
1.9 | Data collection on Ecosan toilet | Kanyonje | Users—18people |
2.9 | Data collection on Ecosan toilet | Nyochoo | Fourth day – population reached |
2.9 | Data collection on Ecosan toilet | Tanglweti | Non users--- 25 people |
2.9 | Data collection on Ecosan toilet | Kanyonje | Users - -28 people |
2.9 | Data collection on Ecosan toilet | Nyochoo | Fourth day – population reached |
2.9 | Data collection on Ecosan toilet | Tanglweti | Non users--- 25 people |
2.9 | Data collection on Ecosan toilet | Kanyonje | Users - -28 people |
3.9 | Data collection on Ecosan toilet | Nyochoo | Fifth day population reached |
3.9 | Data collection on Ecosan toilet | Tanglweti | Non users- 9people |
3.9 | Data collection on Ecosan toilet | Kanyonje | Users – 15people |
3.9 | Data collection on Ecosan toilet | Nyochoo | Fifth day population reached |
3.9 | Data collection on Ecosan toilet | Tanglweti | Non users- 9people |
3.9 | Data collection on Ecosan toilet | Kanyonje | Users – 15people |
6.9 | Planning meeting | Agongo Self help group | The meeting was held and agreed on the way forward on how to complete the unfinished Ecosan units.At Rangwe primary school and Rabuor Kaura. Repair of backdoor steel panels, Floor which was poorly done,and steep stairs. The community to mobilize cements ,3 bags, weld mesh 1 peace,water ,sand and labour before end of November. |
6.9 | Planning meeting | Agongo Self help group | The meeting was held and agreed on the way forward on how to complete the unfinished Ecosan units.At Rangwe primary school and Rabuor Kaura. Repair of backdoor steel panels, Floor which was poorly done,and steep stairs. The community to mobilize cements ,3 bags, weld mesh 1 peace,water ,sand and labour before end of November. |
7.9 | Awareness creation on Econsan toilet on double chamber | Omboga mixed secondary school | Awareness was created to both school committee members and teachers on the Ecological sanitation double chamber toilet. They accepted the new technology.Way foreward mobilization of the required materials for six doors units.To avoid frequent sinking of pit latrines due to poor soil.population reached 42 people. |
7.9 | Awareness creation on Econsan toilet on double chamber | Omboga mixed secondary school | Awareness was created to both school committee members and teachers on the Ecological sanitation double chamber toilet. They accepted the new technology.Way foreward mobilization of the required materials for six doors units.To avoid frequent sinking of pit latrines due to poor soil.population reached 42 people. |
8.9 | Update training | Nyamasaria community | Training was conducted to the interested three household on how to construct the double chamber units, benefits, material required and costing. Population reached 16 people. |
9.9 | Ecosan follow up visit | Nyabede A.I.C church | The constructed two doors units of double chamber are still not in use. The hydro form bricks used was not well molded, and the workmanship was poor. The wall had already developed big cracks ,that created fear for the users. Lack of training on the usage after construction was not conducted. |
9.9 | Ecosan follow-up visit | Nyabeda secondary school | The four constructed units are not in use because of lack of training on how to use them. How to monitor who is to use the units anthill blocking the chambers. No water tanks and roof gutters. Health clubs was formed population reached were 8people. |
9.9 | Ecosan follow-up visits | Nyabeda primary school | The four constructed units are not in use because of anthills’ developed in the chambers, lack of roles division and ownership for maintaining the units, they need update training, some cracks has already appearing on the walling. |
9.9 | Ecosan following visits | Nyabada community | The community members were have problems on how to use the Ecosan units and the end product .The once I followed out 7 only 2 were in use, but lack proper care and maintenance. Population reached 11 people. |
9.9 | Ecosan follow up visit | Nyabede A.I.C church | The constructed two doors units of double chamber are still not in use. The hydro form bricks used was not well molded, and the workmanship was poor. The wall had already developed big cracks ,that created fear for the users. Lack of training on the usage after construction was not conducted. |
9.9 | Ecosan follow-up visit | Nyabeda secondary school | The four constructed units are not in use because of lack of training on how to use them. How to monitor who is to use the units anthill blocking the chambers. No water tanks and roof gutters. Health clubs was formed population reached were 8people. |
9.9 | Ecosan follow-up visits | Nyabeda primary school | The four constructed units are not in use because of anthills’ developed in the chambers, lack of roles division and ownership for maintaining the units, they need update training, some cracks has already appearing on the walling. |
20.9 | Ecosan capacity building workshop | Ugunja | Traveling to Ugunja for the workshop , registration |
21.9 | Field visits to existing UDDTS/DTS | -Ugunja market | The first place was at Ugunja market where we visited a public toilet of a DT. The constructed unit was still lacking the ownership, cleanliness was not well maintained. The unit was, however, well constructed and was in use. |
21.9 | Field visits to existing UDDTS/DTS | -Rambola mixed secondary school | Institutional we visited had lack some of the maintenance and lack of clear roles on who is to do what, when . The construction was complete and in use. |
21.9 | Field visits to existing UDDTS/DTS | -Butere Mumias | At household UDDTs, the place we visited was well maintained and there is ownership. The owner liked them and using the end product. |
22.9 | Ecosan capacity building workshop | Kamunyas hotel. | Capacity building workshop was conducted and well facilitated. |
23.9 | Ecosan capacity building workshop | Kamunyas hotel | The sessions was well presented started with social marketing and it was participatory approach learning, through group work and presentations. |
23.9 | Ecosan capacity building workshop | Kamunyas hotel | Session was well presented through group works and presentation and summarized by the facilitates at the end of presentation of the group work |
24.9 | Ecosan field visits Rosa project | Nakuru | Participants learnt a lot, on the ownership, community involvements and ownership, is started from the awareness creation before the project are implemented. |
25.9 | Ecosan vision Workshop precap | - Red court Hotel South C Nairobi | It was a summative meeting on the previous workshop held on 27/9/2010. The agreement was to have Ecosan network. |
27.9 | Ecosan Vision Workshop | - Red court Hotel South C Nairobi | The workshop was well represented, well facilitated and the method used was participatory approach, where all people participated. Through group work and group presentations, from different NGO’s , on Ecosan technology approaches, for sustainability for the future developments |
4.10 | Post construction training | - Bongu Primary School | Training did not take place to heavy rainfall and few community members turn out. |
5.10 | Post construction training | - Bongu Primary School | Training health club was conducted on how to maintain the units two doors, use of end products application of the urine, personal hygiene. Population reached 15 pupils. |
6.10 | Post construction training | - Bongu Primary School | Training both teachers and community members was conducted and there were well represented. Population reached were over 200 people. |
7.10 | Post construction training | - Kolwak Primary School | Training both teachers and community members on the principle of Ecosan, maintenance, destruction of pathogens, sustainability, roles and responsibilities and how to use the Ecosan toilet and advantages/ disadvantages. Population reached 80 people. |
8.10 | Training health club | - Kisangura primary school | Training both pupils and teachers on how to use the constructed 6 door units maintenance, roles and responsibility and destruction of pathogens, usage the end products .population 60 pupils |
8.10 | Training health club | - Kolwal Primary School | Training both pupils and teachers on how to use the constructed 6 doors units maintenance, roles/ responsibilities, destruction of pathogens and usage of the end products population reached 28 people. |
12.10 | Meeting south Nyanza water service board. | - Kisumu | The purposed of the meeting was to plan how to train both artisan and community members, before the construction. To their targeted groups i.e. Sotik, Kuria and Homa- Bay. |
13.10 | Report writing | - Office | Report was compiled. |
14.10 | Meeting committee members | - Kitere Primary School | Did not take place because of communication brake down. |
15.10 | Report writing | - Office | Report was compiled. |
18.10 | Meeting South Nyanza water service board. | - Kisumu Office | The purpose of budget of the required materials and when to verifying the materials on site. |
19.10 | Verification of materials | - Sotik | Did not take place due to time factors, it was approaching public holiday. |
21.10 | Burial of 1 artisan | - Kotieno | I went to bereaved with family of one of our trained artisan, whom we had worked with in the Ecosan Project since 2004, Burial took place and awareness was created on over 300 people on Ecosan Project |
22.10 | Training church member | - Kokuro | Training was done o church members in Migori District on Ecological sanitation. They were demanding the project and were ready to sustain and own the project. |
25.10 | Community Health meeting | - Nyaburi SDA | Awareness was created at Nyaburi Seventh Day Adventist Church on ecological sanitation, whereby we reached population of over 300 |
26.10 | Traveling to | - Tana | I went to Tana for post construction training |
27.10 | Post Construction Training | - Tana | Training was conducted at St. Getrude Kinthithe Secondary School, to selected students, teachers and board members on the usage of the units and maintenance, destruction of the pathogens and application |
28.10 | Post Construction Training | - Tana | Training was done at Kambithi Secondary School in Maragwa, to both teachers, students and board members on sustainability of the units, destruction of the pathogens, usage of the end products and application |
29.10 | Travelling back | - South Nyanza | Travelling back to the working place from Tana Service board. |
1.11 | School follow-ups | - Olembo Primary | All the units are functional and well maintained |
2.11 | School follow-ups | - Kachan Primary School | All are in use but need replacement of urinal pipe |
3.11 | School follow-ups | - Ndiru Primary School | They are in use but urinal pipe need replacement and repair of the urinal window. |
4.11 | School follow-ups | - Kolwal Primary School | They are all in use and well maintained |
5.11 | School follow-ups | - Siany Secondary School | Are in use but no hand washing tank because o theft cases. |
5.11 | School follow-ups | - Radienya Primary School | Al toilets are in use and well maintained |